A. Introduction

In the spring of 2000, the Government of Ontario provided Western with a total of $42.9 million in capital funding for the University's SuperBuild Projects. SuperBuild at Western involves the construction of three new buildings on the Co nstituent University campus, an essential step in Western's plan to accommodate the anticipated increase in enrolment resulting from the Double Cohort and the baby boom echo. On June 28, 2000 the proposals for the siting of the three new buildings were ap proved by Western's Board of Governors. Table 1 summarizes the updated status of the three new buildings.

We must now proceed quickly to plan for the use of space in the new buildings. This document contains the initial proposals for the allocation of space in the new buildings as well as realignment of some space in existing buildings. The proposals f ollow a series of consultations with Faculty Deans and Directors of Student Service units. These are preliminary proposals; comments/input are welcome and should be submitted directly to the Provost by November 2, 2000.

Table 1

3 New SuperBuild Buildings -- Size and Opening Date

 

 

Size (GSF)

Size (NASF)

Probable # of Floors

Opening Date

1

Advanced Technology Centre (ATC)

90,000

58,500

4

January 2003

2

North Campus Building (NCB)

100,000

65,000

4

Sept 2003

3

South Valley Building (SVB)

107,000

69,550

4

May 2004

4

Total

297,000

193,050

 

 

 

Note: The proposed size of the ATC does not include possible future CFI/OIT initiatives

NASF = "Net Assignable Square Feet"; GSF = "Gross Square Feet"

 

B. Criteria for Space Allocation Proposals

The explicit objective of the SuperBuild Initiative is to increase the capacity of the university system in Ontario. It is critical, therefore, that the primary factors driving the space allocation proposals be enrolment levels and teach ing activity. Increased enrolments and teaching activity will require substantial additional instructional facilities - classrooms and teaching laboratories must be given the highest priority in our new buildings. The increased enrolments must inevitably be accompanied by additional faculty and staff who in turn will require office and research space. Additional research space is essential as we compete for new faculty in a period when growing public support for research is evident in such programs as the Canada Foundation for Innovation (CFI), the Ontario Innovations Trust (OIT), the Ontario Research Development Challenge Fund (ORDCF), the Canadian Institutes for Health Research (CIHR), the Canada Research Chairs (CRC), and expected increases to the Natu ral Sciences and Engineering Research Council (NSERC) and the Social Sciences and Humanities Research Council (SSHRC). Finally, the enrolment increases will also result in space pressures in support areas - in particular, in areas which provide direct ser vices to students.

1. Enrolments

Enrolment levels and the associated teaching activity are the major drivers of the space allocation proposals which follow. Over the past decade, Western's enrolment profile has changed significantly - with a substantial growth in under graduate and graduate programs with high space requirements (see Figure 1).

1.a. Undergraduate Enrolments

As Figure 2 shows, the most significant increases in undergraduate enrolment since 1996-97 have been in the Faculties of Health Sciences, Engineering Science, and Information and Media Studies. Enrolment in the Bachelor of Health Sciences progr am (BHSc), introduced in 1997-98, reached 646 in 1999-2000. Between 1996-97 and 1999-2000, as a result of the government's ATOP initiative, undergraduate enrolments in Engineering and Computer Science increased by 35% and 80% respectively. The undergradua te program in Media, Information, and Technoculture (MIT) was also introduced in 1997-98, and enrolment reached 321 in 1999-2000.

Western's SuperBuild proposals include a commitment to expanding undergraduate enrolment in the Constituent University by 2,100 students and graduate enrolment by 500 students by the year 2004-05. (Note that the total SuperBuild commitment is 3,480 students, which includes the Affiliated Colleges). The undergraduate expansion will take place primarily in first-entry programs in direct response to the upcoming Double Cohort. The ATOP initiative has yet to reach steady-state and further increases are projected for Engineering and Computer Science in the coming years. The BHSc and the MIT continue to grow and are expected to have steady-state enrolments of 1,100 and 450 respectively. Other expanding programs include Nursing, Honors Business Administra tion (HBA), Bachelor of Administrative and Commercial Studies (BACS), and the new undergraduate program in Basic Medical Sciences. The Double Cohort will also be accommodated by general expansion of direct-entry programs in Arts, Science, and Social Scien ce.

 

 

1.b. Graduate Enrolments

Figure 3 shows the changes in graduate enrolment at Western between 1996-97 and 1999-2000. Graduate enrolments in all programs have increased over the past few years, but the greatest increases were in Health Sciences, the Ivey School of Busine ss, Science, and Engineering. Expansion in Health Sciences is due to a new Ph.D. program in Rehabilitation Sciences and the conversion of undergraduate programs in the therapies to graduate programs. The increases in the Ivey School are due to expansions in the high-demand MBA program. The ATOP initiative has resulted in substantial increases in graduate enrolment in Engineering and Computer Science. Increases in all other graduate programs are due to planned expansion in areas of capacity and demand, inc reased success in research activities across the University, and the introduction of new graduate programs.

Table 2 summarizes Western's enrolment projections - approved by SCUP's Subcommittee on Enrolment Planning (SUEPP) - reflecting Western's SuperBuild commitment of 3,480 additional students (of which 2,600 are in the Constituent University) plus an additional 300 graduate students. Since the 300 additional students were not in our SuperBuild commitment, we will be seeking additional capital funds from the Province to accommodate them.

 

 

Table 2

UWO Enrolments: Actual and Projected, 1996-97 to 2005-06

 

Actual

Projected

1996-97

1997-98

1998-99

1999-00

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

Change 2004-05 to 1998-99

1

Constituent University

2

Full-Time Undergraduates

3

Constituent

4

Arts

1,535

1,448

1,370

1,392

1,388

1,399

1,439

1,503

1,511

1,521

 

5

Business

282

295

291

342

419

436

440

440

440

440

 

6

Dentistry

190

192

214

219

214

214

221

224

224

224

 

7

Education

662

688

680

794

820

820

820

800

775

750

 

8

Engineering

983

1,058

1,132

1,324

1,366

1,482

1,539

1,560

1,560

1,560

 

9

Health Sciences

 

 

 

 

 

 

 

 

 

 

 

10

-- BHSc Program

0

149

382

647

987

1,146

1,175

1,169

1,115

1,135

 

11

-- Kinesiology

943

1,186

1,148

1,166

1,052

986

973

955

916

916

 

12

-- Nursing

277

294

297

306

341

377

400

440

475

475

 

13

-- Therapies

326

324

222

204

210

165

104

40

40

40

 

14

-- Sub-Total

1,546

1,953

2,049

2,323

2,589

2,674

2,652

2,604

2,546

2,566

 

15

Information and Media Studies

0

80

233

321

408

449

450

451

452

452

 

16

Law

441

438

445

447

457

465

465

465

465

465

 

17

Medicine

 

 

 

 

 

 

 

 

 

 

 

18

-- MD Program

389

391

395

401

410

420

430

430

430

430

 

19

-- BMedSci Program

 

 

 

 

 

 

50

50

50

50

 

20

Music

329

370

362

381

398

406

409

416

417

417

 

21

Science

3,695

3,664

3,619

3,588

3,442

3,357

3,412

3,508

3,513

3,518

 

22

Social Science

5,429

5,240

5,078

5,070

5,215

5,317

5,392

5,531

5,524

5,534

 

23

Total Full-Time Undergraduates

15,481

15,817

15,868

16,602

17,127

17,439

17,719

17,982

17,906

17,926

2,038

24

Total Medical Residents

459

448

441

446

441

441

441

441

441

441

 

25

Full-Time Graduates

26

Masters

1,629

1,812

2,048

2,132

2,216

2,336

2,436

2,536

2,636

2,636

 

27

Ph.D.

688

706

713

755

780

820

855

890

925

925

 

28

Total Full-Time Graduates

2,317

2,518

2,761

2,887

2,996

3,156

3,291

3,426

3,561

3,561

800

29

Total Constituent Full-Time

18,257

18,783

19,070

19,935

20,564

21,036

21,451

21,849

21,908

21,928

 

30

Part-Time FTEs

31

Undergraduate

2,515

2,333

2,188

2,111

2,100

2,100

2,125

2,150

2,250

2,250

62

32

Education (AQ Courses)

348

379

368

468

500

500

500

500

500

500

 

33

Masters

119

117

110

98

100

110

110

110

110

110

 

34

Ph.D.

25

17

18

14

18

18

18

18

18

18

 

35

Total Constituent Part-Time FTEs

3,007

2,846

2,684

2,691

2,718

2,728

2,753

2,778

2,878

2,878

 

36

Total Constituent FTEs

21,264

21,629

21,754

22,626

23,282

23,764

24,204

24,627

24,786

24,806

 

37

Total Affiliate FTEs

3,429

3,397

3,387

3,661

3,700

3,750

4,000

4,160

4,267

4,247

880

38

Total UWO FTEs

24,693

25,026

25,141

26,287

26,972

27,514

28,204

28,787

29,053

29,053

 

39

Total UWO FTEs (excluding AQ's)

24,345

24,647

24,773

25,819

26,472

27,014

27,704

28,287

28,553

28,553

3,780

 

40

Constituent Year 1

41

Admin. & Comm. Studies

379

492

486

562

550

550

550

600

550

550

 

42

Arts

411

411

357

372

360

375

410

435

410

375

 

43

Engineering

294

349

405

493

425

500

500

500

500

500

 

44

Health Sciences

 

 

 

 

 

 

 

 

 

 

 

45

-- BHSc Prog

0

149

208

200

300

300

300

300

300

300

 

46

-- Kinesiology

444

590

461

424

340

330

345

345

330

330

 

47

-- Nursing

65

68

76

87

90

100

100

100

100

100

 

48

M.I.T.

0

5

80

108

125

125

125

125

125

125

 

49

Music

105

132

105

106

125

125

125

125

125

125

 

50

Science

963

1,005

1,032

1,098

960

1,000

1,050

1,110

1,010

1,000

 

51

Social Science

1,064

1,014

886

908

915

945

995

1,060

985

945

 

52

Total Year 1 - Constituent

3,725

4,215

4,096

4,358

4,190

4,350

4,500

4,700

4,435

4,350

 

Assumes International student enrolments remain constant throughout the forecast period

 

2. Undergraduate Teaching Activity

The space requirements associated with enrolment expansion will be felt not only in the program of student registration but also by those academic units sharing in the instruction of those students; expansion in particular programs will result in increased teaching activity in others. For example, the enrolment increases in Engineering and Health Sciences substantially increase teaching activity in Science and Medicine & Dentistry; enrolment increases in the MIT program result in in creased teaching activity in Arts and Social Science.

As shown in Figure 4, the largest increases in undergraduate teaching activity have taken place in Science, Health Sciences, Information and Media Studies, and Engineering. Future increases are projected across all Faculties, and are a function of teaching students within the home Faculty as well as teaching of students in other expanding programs. These increases in undergraduate teaching activity will place severe pressures on instructional facilities and on office and research space for the addi tional faculty members required to do the teaching.

 

 

3. Expansion of Research Activity

Western has been extremely successful in recent provincial and federal research competitions. To-date $60 million in CFI/OIT/Matching funds has been secured in support of outstanding research initiatives in Engineering, Health Sciences, Medicine, Science, and Social Science. Of this $60 million, $11.5 million is targeted towards space/facilities requirements for these initiatives. Some of these initiatives must be housed in the new buildings while others will be accommodated through ren ovations to existing facilities.

Over the next 5 years, Western will be awarded a total of 64 Canada Research Chairs. Many of these CRCs will be in areas requiring substantial research space and must be accommodated in either the new buildings or in existing buildings.

 

C. Space Allocation in the New Buildings

Expectations and Guidelines

The space allocation proposals outlined here address both the allocation of space in the new buildings and the realignment of space in existing buildings. All instructional facilities will be established as General University (GU) Facil ities except for highly specialized teaching laboratories. Responsibility for scheduling, maintenance, and upgrades of GU facilities will rest with the central university and responsibility for specialized teaching laboratories will rest with the Facultie s. Other space allocations to units (i.e. office space, meeting/service space, and research space) will be made as global allocations, and it is the responsibility of the Deans and Budget Unit Heads to allocate the space within their units based on priori ties.

As we proceed with construction of the new buildings, we will ensure that space does not exceed the Council of Ontario Universities (COU) and the Ministry of Training, Colleges, and Universities (MTCU) space standards, the same standards used in al l recent construction and renovation activities at Western. Our SuperBuild proposal included a commitment to achieving 30% efficiency in new space (i.e. operate with 70% of the space required by the COU/MTCU space standards) and therefore we will work wit h Deans and Budget Unit Heads to ensure that new space is designed efficiently.

 

Regular Review of Space Inventory and Requirements

Space reallocation is a difficult issue at any university. As Western moves ahead with the creation of substantial additional space, we must seek mechanisms that will allow for a more nimble and responsive space reallocation process in the future. As the enrolment and research profile of the various Faculties evolve, we must be in a position to reallocate space to areas of need.

Towards this end, a proposal dealing with the process of future space reallocation will be brought forward during the 2001-02 planning process. The proposal will involve regular reviews of space inventory and space entitlement based on COU/MTCU sta ndards and will link unit space to budget allocations. Responsibility for space lies both with the central university and with Deans and Budget Unit Heads. The central university makes space allocations to Faculties and support units and the Deans and Bud get Unit Heads are responsible for making the best use of the space in meeting the diverse needs of their Faculties and units.

 

D. The SuperBuild Projects

1. The Advanced Technology Centre (ATC)

Table 3 summarizes the space allocation proposals for the Advanced Technology Centre, expected to open in January of 2003.

Table 3

The Advanced Technology Centre (ATC): Space Allocation

 

 

NASF

1

Faculty of Engineering Science

 

2

  • Incremental (non-teaching) Space -- to accommodate enrolment growth

15,000

3

  • Incremental Instructional Lab Space -- to accommodate enrolment growth

7,500

4

  • Transfer of Elborn Activities to ATC

9,200

5

  • Sub-Total Engineering Science

31,700

6

CFI/OIT Initiatives

10,400

7

General University (GU) Classrooms (see Table 6)

8,000

8

Food Services and Seating/Gathering Space

2,000

9

Other General University (GU) Facilities

6,400

10

Total

58,500

 

 

 

2. The North Campus Building (NCB)

Table 4 summarizes the space allocation proposals for the building to be sited next to the Visual Arts Building, the North Campus Building (NCB), expected to open in September of 2003.

 

Table 4

The North Campus Building (NCB): Space Allocation

 

 

NASF

1

Faculty of Science

 

2

  • Relocation of Mathematics Department from Middlesex College

6,250

3

  • Relocation of Applied Math Department from Western Science Centre

8,750

4

  • Transfer of Instructional Biology Labs from Staging Building

16,000

5

  • Additional Space to Accommodate Increased Teaching Activity

3,000

6

  • Sub-Total Science

34,000

7

General University (GU) Classrooms (see Table 6)

15,600

8

General University (GU) Research Facilities

6,000

9

Food Services and Seating/Gathering Space

2,000

10

Other General University (GU) Facilities

7,400

11

Total

65,000

 

 

 

3. The South Valley Building (SVB)

Table 5 summarizes the space allocation proposals for the new building to be located on the existing site of J.W. Little Stadium, the South Valley Building (SVB), expected to open in May of 2004.

 

Table 5

The South Valley Building (SVB): Space Allocation

 

 

NASF

1

Faculty of Health Sciences

 

2

  • Relocation of Dean's Office from Health Science Addition

2,200

3

  • Relocation of FHS Offices from Somerville (excl. Olympic Studies)

3,700

4

  • Incremental Space for Expanding BHSc Program and Ph.D. Program

4,100

5

  • Sub-Total Health Sciences

10,000

6

Relocation of Student Health Services from UCC

10,000

7

General University (GU) Classrooms (see Table 6)

21,600

8

General University (GU) Computer Labs -- 4 labs @ 50 seats each

7,000

9

General University (GU) Research Facilities

10,000

10

Food Services and Seating/Gathering Space

5,000

11

Other General University (GU) Facilities

5,950

12

Total

69,550

 

 

 

4. General University (GU) Instructional Facilities

Table 6 summarizes the preliminary proposals regarding instructional facilities in the three new buildings. A total of 52,200 NASF is being allocated for GU classrooms and computer labs. Further review of the proposals is required, and therefore the number and size of the rooms may change - but the overall space allocation for classrooms is not expected to change.

Table 6

GU Classrooms in New SuperBuild Buildings

 

NASF per

ATC

NCB

SVB

Total

 

 

Seat

# of Rooms

NASF

# of Rooms

NASF

# of Rooms

NASF

# of Rooms

NASF

1

800 Seat Classrooms

12

 

 

 

 

1

9,600

1

9,600

2

500 Seat Classrooms

12

 

 

 

 

1

6,000

1

6,000

3

300 Seat Classrooms

12

 

 

1

3,600

 

 

1

3,600

4

200 Seat Classrooms

15

2

6,000

2

6,000

 

 

4

12,000

5

100 Seat Classrooms

20

 

 

2

4,000

2

4,000

4

8,000

6

50 Seat Classrooms

20

2

2,000

2

2,000

2

2,000

6

6,000

7

50 Seat Computer Labs

35

 

 

 

 

4

7,000

4

7,000

8

Total

 

4

8,000

7

15,600

10

28,600

21

52,200

 

Note: Configuration of classroom space in the NCB and the SVB will require further review and analyses.

Therefore, the number and size of rooms may change -- but overall space for classrooms will not change.

 

E. Other Space Realignment Proposals

The proposals for the allocation of new space described in section D will liberate space in existing buildings that can be utilized to address the space needs of expanding academic activities across the university. The following initiati ves are proposed:

  1. Let's Talk Science (currently in the Health Science Addition) be relocated to Elborn College space vacated by the Faculty of Engineering Science. The amount of space and associated costs will be discussed with Let's Talk Science.
  2. Space vacated by Let's Talk Science (1,900 NASF) and by the offices of the Dean of Health Sciences (2,200 NASF) in the Health Sciences Addition be allocated to Nursing to accommodate expanding graduate and undergraduate programs.
  3. Activity-based programs in the Faculty of Health Sciences - degree-credit courses in Kinesiology,Campus Recreation, and Intercollegiate Athletics - require additional activity space. It is proposed that teaching currently done in Alumni Hall be transferred to the new large classrooms. Scheduling of activities in Alumni Hall will continue to be done through the central university, but priority will be given to the Faculty of Health Sciences for activity-based programs. The Dean of Health Science s will assign the space based on priorities within the Faculty.
  4. Enrolments in the Faculty of Education have increased substantially. The Faculty has been able to accommodate the increases but some instructional facilities at Althouse College require renovations. These renovations will be funded by the Unive rsity's capital budget in 2001-02 and 2002-03.
  5. The MIT program in the Faculty of Information and Media Studies (FIMS) continues to grow rapidly, creating serious space pressures within the Faculty. FIMS will be allocated 3,100 NASF of space in Middlesex College vacated by the Department of Mathematics -- 2,100 NASF for faculty offices and research space, and the remaining 1,000 NASF for a multi-media instructional facility to be established by FIMS in collaboration with the Faculties of Arts and Music. Costs of equipping the facility, futur e upgrades, and on-going operating costs will be the responsibility of the three Faculties involved in the initiative.
  6. The Centre for Women's Studies and Feminist Research (CWSFR) and the Centre for Research in Violence Against Women and Children (CRVAWC), currently located in University College, be relocated to space in Middlesex College vacated by the Department of Mathematics. The two centres will be allocated a total of 2,200 NASF, an increase of 500 NASF.
  7. The space liberated by the relocation of CWSFR and CRVAWC be allocated to the Faculty of Arts. The Faculty also will be a partner, with the Faculty of Information and Media Studies and the Faculty of Music, in the new multi-media instructional facility to be established in Middlesex College.
  8. The Faculty of Medicine and Dentistry is also facing space shortages associated with expanding programs and increased research activity. Additional space is being provided through the Dental Facilities Project already underway and by way of eff iciencies arising in the Medical Building Project, now in design stages. The proposed GU classrooms in the new buildings will be available to the Faculty's new undergraduate program in Basic Medical Sciences.
  9. The Faculty of Music will be a partner in the proposed multi-media instructional facility in Middlesex College. Some of the proposed new classrooms in the South Valley Building (SVB) will be designed to accommodate music instruction.
  10. ATOP-related expansion in Computer Science must be supported by additional space. A total of 7,500 NASF in the Western Science Centre liberated by the relocation of the Department of Applied Mathematics will be returned to the Faculty of Science. The Dean of Science will be authorized to allocate this space to Computer Science and other activities based on priorities within the Faculty.
  11. Incremental space for faculty offices be made available to the Faculty of Social Science by converting some small, under-utilized seminar rooms in the Social Science Centre to office space, creating 2,800 NASF in additional office space. The De an of Social Science will be authorized to allocate this space based on priorities within the Faculty.
  12. The University Library System is short of both storage space and student study space. A total of 15,000 NASF in the Staging Building vacated by the relocation of instructional Biology labs will be allocated for library storage space. This alloc ation will allow for reconfiguration of space in the Weldon Library to create additional student study space. Due to load-bearing limitations, library storage in the Staging Building will be restricted to the main floor, requiring some reconfiguration.

  13. As indicated earlier, the Vice-President (Administration) is in the midst of discussions with the University Students' Council (USC) regarding space realignment in the University Community Centre (UCC). It is anticipated that these discussions will ma ke available much needed additional space for student service operations such as Campus Recreation and the Student Development Centre and for the University's Food Services Operation.
  14. The University Book Store is experiencing severe space shortages. One proposal would be to allocate the space vacated by Student Health Services in the UCC to the University Book Store. This space is contiguous to the current Book Store locatio n. An alternative proposal is the construction of an addition to the UCC to provide additional space to the Book Store.
  15. The University requires additional space for Special Needs Exams. A total of 900 NASF of space in a building on the west side of Western Road, contiguous to space already occupied by operations of the Student Development Centre (SDC), will be a llocated for this purpose. Current SDC space on the west side of Western Road already houses some of the special needs exam rooms.
  16. During the current academic year, it is hoped that the Western Centre for Continuing Studies (WCCS) will relocate most of its activities to downtown London. The Office of Institutional Planning and Budgeting would then move into space vacated by WCCS, creating flexibility in the Stevenson-Lawson Building for other administrative space needs.
  17. The proposed siting of the new South Valley Building will require the demolition of the J.W. Little Stadium and the Graphics Building. Additional parking and two athletic fields will be created on the liberated land. The University conti nues to work on a plan for additional parking in the Althouse College precinct adjacent to Western Road.

 

F. Conclusion

A number of general points require repetition and elaboration.

Western's experience over the past five years has underscored the fact that, no matter how well a building might fit today's requirements, its real value is ultimately assessed by its ability to adapt to new, always unforeseen, demands of tomorrow' s research and educational priorities. An overarching priority in all of these construction projects will be to design and build space that can adapt to a variety of functions, that can assume new configurations at minimum expense, and that can be enlarge d as additional demands arise. Such flexibility will leave a legacy that will be appreciated by those faced with space needs very different from those we now experience at Western.

Once these projects are turned over to those responsible for detailed planning, it is critical that efficiencies be sought at every turn and that the COU/MTCU space standards, as well as the initial budgets not be exceeded. The Office of Institutio nal Planning & Budgeting and the Physical Plant Department will support Deans in whatever way possible but final responsibility for the alignment of these projects with operational needs and within available capital resources must rest with the Deans and unit heads involved.

Additional space needs already loom on the horizon, most obviously associated with future success in CFI/OIT projects, the CRC program, and anticipated enrolment expansion. As much as we welcome these opportunities, we must be realistic and prudent about the additional demands they will place on Western's facilities. The modest amount of space reserved for future allocation is in recognition of the yet-to-be defined needs.

The proposals in this document reflect our best efforts to integrate the many and diverse space needs of an expanding and rapidly changing university within the finite limits of the resources made available by the SuperBuild initiative. The proposa ls will not entirely satisfy the expectations of our programs under greatest space pressures and will fall short of the understandable hopes of other programs for flexibility and elbow room. Accepting this, the SuperBuild projects promise significant impr ovements in physical facilities for Western's students, faculty, and staff.

We must move ahead in the very new future with all these projects; time pressures are especially acute for the ATC project. We welcome responses to these proposals - some opportunities and needs may have been overlooked or inadequately addressed. C omments and suggestions should be directed to the Provost by November 2, 2000.

 

 Back to UWO Documents and Data